Su-Kam’s Solar Projects

Besides running millions of households on solar power systems, Su-Kam has also helped state governments, prestigious institutions and Indian army go solar. We have been trusted choice of Ministry of New and Renewable Energy (MNRE) and have executed many large-scale solar projects.


 Watch this Video to See Su-Kam’s Solar Projects in India:





250kwp Solar Mini-grid in Uttar Pradesh

Su-Kam has undertaken a series of important solar projects under Uttar Pradesh (UP) Government. The project involved solar electrification of villages and towns in the state. Su-Kam’s 250kwp solar mini grid plant, inaugurated by Late Dr. Abdul Kalam and Chief Minister of UP, Sh. Akhilesh Yadav, makes 3.65 lakh units of energy annually and runs 417 households in Fakir Pura and Chanduahar – two 100% solar – powered villages of UP.

Read more


Solarizing 12,000 Houses in Tamil Nadu

Su-Kam has been chosen by TEDA (Tamil Nadu Energy Development Agency) to install solar power systems in more than 12,000 houses in 10 districts of Tamil Nadu. We have also solarized the most famous college of Tamil Nadu – Loyala College. Su-kam’s 70 solar LED street lighting systems and 8kw off-grid solar system light up the college in the most Eco-friendly way possible.




1.3MW Grid-tie Solar Power Plant at Punjab Engineering College, Chandigarh

Su-Kam was appointed by CREST ((Chandigarh Renewable Energy Science and Technology Promotion Society) to set up 1.3 MW Grid-tie system at Punjab’s famous university – Punjab Engineering College. The solar system continuous to run 50% of university’s total load for the next 10 years. Su-Kam is also responsible for the maintenance of solar system.


1.3MW Solar Power Plant Covering 18 Sites for Assam Rifles

MNRE under Jawahar Lal Nehru National Solar Mission in India chose Su-Kam to solarize Assam Rifles. We’re to proud to run 18 sites for Indian Army’s division, Assam Rifles, on 1300 kwp Su-Kam’s off-grid solar power plant. Difficult terrains of Manipur, Nagaland, Tripura, Mizoram and Assam, where Assam Rifles operates, were facing frequent power outages.

Read more 




Solar DC Systems at 40,000 Households in UP

UP Government chose Su-Kam to solarize 40,000 households in remote villages of UP through solar DC systems. Electricity had never reached these villages, but now villagers enjoy non-stop power with Su-Kam’s DC home lighting system. Watch the video to see their happy faces.

Read more 


150kwp Grid-Tie Solar Power System at ITM University

Su-Kam’s 150KWp solar power plant at ITM Univeristy in Gurgaon generates more than 2 lacs units of electricity per year while supplying clean energy to the university.

Read more 




100KWp Solar Installation at State Bank Academy

The prestigious State Bank Academy in Gurgaon, spread across 11 acres of land, turned to Su-Kam for solarizing its building. Team Su-Kam has installed 100KWp grid-tie solar power system which is going to make more than Rs. 12Lacs worth of electricity through solar.

Read more 


Delhi Jal Board Runs on Su-Kam’s Solar Power System

Su-Kam 50KVA grid-tie system at Delhi Jal Board generates 90,000 units of electricity per year. The installation makes an annual saving of Rs. 7 lacs per year.

Read more 




150KWp Solar Parking at IFFCO, Gurgaon

Su-Kam has solarized parking area at IIFCO tower. The interesting solar installation generates more 1,00,000 units of electricity while providing shade to vehicles.

Read more 


40KWP Solar at Allied Engineering Works

Su-Kam’s grid-tie solar system at Allied Engineering Works in Delhi generates 56,000 units of electricity which translates into Rs. 5 lacs of saving per month. The system consists of two 20 KW grid-tie inverters and 160 solar PV panels of 250 watt each.

Read more 




Su-Kam Solarizes Clay Crafts with 100KWP Solar System

Su-Kam’s 100 KWP Grid-Tie Rooftop Solar PV power plant at Clay Crafts in Jaipur is making 1,40,000 units of electricity and helping the business save Rs. 9 lacs every year.

Read more 


90 KWP Solar Installation at Engineers India Limited

The leading design and engineering organization in South Asia, EIL, went solar to help save the enviroment and money. The 90 kWp Grid tie solar generates over 1.25 lakh and saves over Rs 10 lakh rupees in electricity consumption annually!




NHPC, Faridabad Runs on Su-Kam’s Solar System

National Hydroelectric Power Corporation’s big building in Faridabad is powered by Su-Kam’s 70KWP grid-tie solar system. The installation generates approximately 90,000 units of electricity per year, thereby helping the office save around Rs.7,20,000 annually.


100KWP Solar Installation for Delhi Metro

Su-Kam has solarized parking are of HUDA city centre metro station in record time of 15 days. The system provides shade to vehicles and makes 1,40,000 units of electricity for Delhi Metro.

Read more 




Su-Kam’s Solar Project for Hospitals in Tripura

Su-Kam was commissioned by Tripura Renewable Energy Development Agency (TREDA)to install and maintain a 630 kWp off-grid solar systems at primary health care at 97 centres and hospitals in remotest areas of Tripura. We’re proud to say that this installation is not only making green energy but is also saving lives.

Read more 


100KWP Solar at GATES Institute of Technology

Spread across 1 acre of rooftop space, this solar installation has generated more than 8 lacs worth of electricity for the premier educational institute. The 100KWP off-grid installation gives 24×7 green electricity to power college campus.

Read more